Sign In | Join Free | My chinaqualitycrafts.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Engineering Drilling Rig >

150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction

  • 1
  • 2

Brand Name : JINZHOU SHITAN

Model Number : XY-1A

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 20000 sets per year

Delivery Time : 3-7 days

Packaging Details : Standard Export Package

Product name : XY-1A Engineering Drilling Rig Machine

Hole Diameter : Customized

Drilling Depth : 150 Meters

Voltage : 380v

Application : Water Well Drilling ,Geological Exploration

OEM : Acceptable

Power Type : Diesel

Condition : New

Warranty : 1 Year

Weight : 500kg

Diameter : Customized

Contact Now

150 Meters Depth XY-1A Water Well Borehole Construction Engineering Drilling Rig Machine

XY-1A Engineering Drilling Rig Machine Introduction

The diesel engine is 1105, 18 HP , the sliding stroke is 350mm, the water pump pressure is 1.2MPa, the winch lifting force is 10kN, and the weight is 500kg. XY-1 drilling rig is a portable drilling machine with oil pressure feeding. The drilling depth is 100m, the maximum opening diameter is 130mm, and the final hole diameter is 75mm.It depends on the formation conditions

XY-1A Engineering Drilling Rig Machine Technical Information

XY-1 A Engineering Drilling Rig
Drilling diameter(mm) 75,91,110,130,150
Drilling depth (m) 150,100,70,50,30
Drill pipe diameter (mm) 42,43
Drilling angle(°) 90~75
Equipment size(L * B * H) 1700 * 780 * 1274 (mm)
Rig weight (except engine) 540
Gyrator
Spindle speed (four gear) (r/min) 140,295,470,790,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 0.5
Winch assembly
Winch maximum lifting force (single rope)(KN) 11
Reel speed (r/min) 36,76,121
Reel circumferential speed(m/s) 0.31,0.66 ,1.05
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 35
Brake diameter(mm) 252
Brake band width (mm) 50
Water pump
Pump type Horizontal single cylinder double acting
Maximum displacement (motor)(L/min) 95(77)
Work pressure (Mpa) 0.7
Cylinder diameter (mm) 80
Piston stroke(mm) 100
The maximum allowable pressure (Mpa) 1.2
Oil pump
Oil pump type Gear pump
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500

XY-1A Engineering Drilling Rig Machine advantages:

1, The oil pressure feeding mechanism can improve drilling efficiency and reduce the labor intensity.

2 ,The drilling rig is equipped with a ball mounted card blessing mechanism with six side active drill rods. The utility model can perform no stopping and falling rod. And it has the advantages of high work efficiency, convenient operation, safety and reliability.

3 ,Hole pressure gauge indicates pressure which can be easy to grasp the situation inside the hole.

4, Handle concentration, easy operation.

5, It is compact, small in size, light in weight, strong in decomposition and easy to remove .It can be used in plains and mountains.

Xy-1A Engineering Drilling Rig Machine Drilling Process

First, level the site and build a drilling platform (that is, clamp a 4m * 4m platform with a rack pipe)
2. Hoist the drilling rig and level the drilling rig
3. Support drilling rack, tripod,
4. If the drilling speed is simple, the drilling speed is not fast, and the drilling speed is not fast
5. If the drilling is in sandy soil and pebble layer, connect the water supply pipeline before drilling, and use mud or protective pipe to protect the wall during drilling to prevent hole collapse.
6.Alloy drilling is often used when drilling sand layer. Diamond bit is used to drill pebbles.
150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction

150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction


Product Tags:

150 meters depth borehole drilling rig

      

xy-1a borehole drilling rig

      

water well construction borehole drilling machine

      
Quality 150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction for sale

150 Meters Depth Xy-1a Borehole Drilling Rig Water Well Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)